General terms

END CUSTOMERS

By Decision 595 from 17.01.2017 the Supreme Administrative Court (SAC) has finally repealed Decision -05 from 21.07.2014 . of the State Energy and Water Regulatory Commission (SEWRC, currently Energy and Water Regulatory Commission), which had approved General Terms and Conditions for access and transmission of electric power through the electricity distribution grid of ENERGO-PRO Grid AD (entered into force on 07.09.2014). According to Decision 595 17.01.2017 of SAC, the EWRC will renew the procedure for approval of new General Terms and Conditions of ENERGO-PRO Grid AD.

After the repeal of Decision -05 from 21.07.2014 of SEWRC, until the approval of the Energy and Water Regulatory Commission of new General Terms and Conditions and their entering into force, the company will apply in its relations with the clients the acting before 07.09.2014:

Repealed by Decision 595 17.01.2017 of SAC General Terms and Conditions for access and transmission of electric power through the electricity distribution grids of ENERGO-PRO Grid AD (in Bulgarian)


RENEWABLE ENERGY SOURCES POWER GENERATORS


The General terms and conditions for access of renewable energy sources power generators to the electricity distribution grid of ENERGO-PRO Grid AD in compliance to Art. 30 of the Renewable Energy Sources Act are approved by SEWRC with Decision No -9/20.05.2013 and decision -11 / 01.07.2013 regarding correction of obviously factual mistake

General terms and conditions for access of renewable energy sources power generators to the electricity distribution grid (in Bulgarian)

Date of publication: 30.05.2013

In connection with applying article 7 from Ordinance 1 from 18.03.2013 for regulation of the prices of electricity (changed and supplemented, publ. in State Newspaper, number 4 from 16.01.2015) Appendix 2 to the General terms and conditions for access of renewable energy sources power generators to the electricity distribution grid of ENERGO-PRO Grid AD has been updated and replaced Reporting protocol for the produced and received in the electricity distribution grid active electrical energy.